Team Daily Log:
-Today we worked on the control box and soldering the control box
-Bought the frame
-Stripped 1cm of tether wire)
-Cut and stripped motor wires
-Color coded the Tether Wires to the Motor Wires
-Talked about our plan for the next class
-Cleaned up
-Wrote Logs