Team Daily Log:
-Finished watching videos.
-Talked about how to build a frame.
-Went off separately to work on our assigned part.
-Cleaned Up.
-Wrote Logs.
Friday, May 12, 2017
Subscribe to:
Post Comments (Atom)
Day 6 (5/19/17)
Team Daily Log: -Kate and Erik started and finished waterproofing the wires together -Andy Worked on the control box and tested to make su...
-
Team Daily Log: -Finished watching videos. -Talked about how to build a frame. -Went off separately to work on our assigned part. -Clean...
-
Team Daily Log: -Today we worked on the control box and soldering the control box -Bought the frame -Stripped 1cm of tether wire) -Cut a...
-
Team daily log: -Andy finished up on control box and worked on multi meter along with testing the control box -Esme finished the framed an...
No comments:
Post a Comment