Team Daily Log:
-Kate and Erik started and finished waterproofing the wires together
-Andy Worked on the control box and tested to make sure it worked (and it did!)
-Esme listened to Mrs. S's lesson and then took pictures and helped out the rest of our team
Kraken Me Up
Friday, May 19, 2017
Thursday, May 18, 2017
Day 5 (5/18/17)
Team daily log:
-Andy finished up on control box and worked on multi meter along with testing the control box
-Esme finished the framed and talked about placement of motors and cameras
-Eric and Kate worked on attaching the tether wires to the motor wires
-Andy finished up on control box and worked on multi meter along with testing the control box
-Esme finished the framed and talked about placement of motors and cameras
-Eric and Kate worked on attaching the tether wires to the motor wires
Tuesday, May 16, 2017
Day 4 (5/16/17)
Team Daily Log:
-Today we worked on the control box and soldering the control box
-Bought the frame
-Stripped 1cm of tether wire)
-Cut and stripped motor wires
-Color coded the Tether Wires to the Motor Wires
-Talked about our plan for the next class
-Cleaned up
-Wrote Logs
-Today we worked on the control box and soldering the control box
-Bought the frame
-Stripped 1cm of tether wire)
-Cut and stripped motor wires
-Color coded the Tether Wires to the Motor Wires
-Talked about our plan for the next class
-Cleaned up
-Wrote Logs
Friday, May 12, 2017
Day 3 (5/12/17)
Team Daily Log:
-Finished watching videos.
-Talked about how to build a frame.
-Went off separately to work on our assigned part.
-Cleaned Up.
-Wrote Logs.
-Finished watching videos.
-Talked about how to build a frame.
-Went off separately to work on our assigned part.
-Cleaned Up.
-Wrote Logs.
Tuesday, May 9, 2017
Day 2 (5/9/17)
Team Daily Log:
-Worked on blog
-Watched videos on how to work the equipment
-Practiced using the equipment (i.e. Wire cutters, Soldering, etc)
-Wrote our Daily Logs
-Worked on blog
-Watched videos on how to work the equipment
-Practiced using the equipment (i.e. Wire cutters, Soldering, etc)
-Wrote our Daily Logs
Friday, May 5, 2017
Day 1 (5/5/17)
Group Daily Journal:
-Finished the Blog
-Passed the Interview
-Started Practicing how to use ROVs with Last Year's ROVs
-Finished the Blog
-Passed the Interview
-Started Practicing how to use ROVs with Last Year's ROVs
Subscribe to:
Posts (Atom)
Day 6 (5/19/17)
Team Daily Log: -Kate and Erik started and finished waterproofing the wires together -Andy Worked on the control box and tested to make su...
-
Team Daily Log: -Finished watching videos. -Talked about how to build a frame. -Went off separately to work on our assigned part. -Clean...
-
Team Daily Log: -Today we worked on the control box and soldering the control box -Bought the frame -Stripped 1cm of tether wire) -Cut a...
-
Team daily log: -Andy finished up on control box and worked on multi meter along with testing the control box -Esme finished the framed an...